[{"data":1,"prerenderedAt":154},["ShallowReactive",2],{"{\"language\":\"fr\",\"resolve_relations\":[\"post.author\"]}posts\u002Ftexas-data-center-moratorium-ai-infrastructure":3},{"data":4,"headers":131},{"story":5,"cv":118,"rels":119,"links":130},{"name":6,"created_at":7,"published_at":8,"updated_at":9,"id":10,"uuid":11,"content":12,"slug":110,"full_slug":111,"sort_by_date":59,"position":112,"tag_list":113,"is_startpage":24,"parent_id":114,"meta_data":59,"group_id":115,"first_published_at":116,"release_id":59,"lang":65,"path":59,"alternates":117,"default_full_slug":59,"translated_slugs":59},"Texas Moratorium Puts Guardrails on AI Data Centers","2026-08-11T15:44:35.601Z","2026-08-11T16:42:41.681Z","2026-08-11T16:42:41.694Z",207968156083520,"3e2ad306-7ef8-4927-ad16-909c8e8f03cf",{"seo":13,"_uid":27,"date":28,"intro":29,"title":30,"author":31,"blocks":68,"category":104,"featured":24,"component":105,"thumbnail":106,"hero_image":108},[14],{"_uid":15,"image":16,"title":6,"component":25,"description":26},"0b2255c1-04c6-484f-9505-d1f055394cba",{"id":17,"alt":18,"name":19,"focus":19,"title":19,"source":19,"filename":20,"copyright":19,"fieldtype":21,"meta_data":22,"is_external_url":24},207968453842624,"dpd_1","","https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002F1261x831\u002F718e276b65\u002Fistock-1299944072.jpg","asset",{"alt":18,"size":23,"title":19,"source":19,"copyright":19},"1261x831",false,"seo","Texas' moratorium on new data-center approvals is the defining story of the week, and a clear signal that the AI infrastructure boom is entering a more heavily scrutinized phase. In this issue of Digital Power Weekly, Keel Infrastructure SVP Chris Ruppel unpacks what it means that ERCOT's interconnection queue has swelled to more than 474 GW, over five times the state's record peak demand, with data centers accounting for roughly 90% of new power requests. Texas' audit will examine projects' electricity and water requirements, on-site generation, public incentives, ownership and community impacts, while ERCOT has paused its initial \"Batch Zero\" review pending the outcome.\n\nAt the same time, the underlying demand for AI infrastructure remains substantial. Anthropic signed a $10 billion computing agreement, financiers are weighing at least $36 billion of additional debt to fund its chip capacity, CoreWeave is expanding into Indonesia, and Caterpillar reported robust data center-driven demand for power equipment. Ruppel's analysis reads these signals alongside the Texas moratorium, arguing that capital commitments have not slowed even as the regulatory environment tightens around them.\n\nRuppel's bottom line: this week's throughline is not a slowdown in AI ambition, but a shift from unchecked expansion toward proof of viability. Ruppel's bottom line is that AI ambition has not slowed this week. Expansion now has to come with proof of viability. Developers increasingly must demonstrate that projects can be financed responsibly, supported by constrained grids and water systems, operated reliably, and secured against emerging technical and cyber risks. That shift in what counts as investment-ready is quickly becoming the new baseline for site selection.\n\n","e270c710-bcda-4642-9482-84d4501225d8","2026-08-10 00:00","Texas' data center moratorium tests AI infrastructure growth as ERCOT's queue hits 474 GW. Keel's Chris Ruppel breaks down what it means for developers.","Digital Power Digest- Volume 1: August 3 - August 9, 2026",{"name":32,"created_at":33,"published_at":34,"updated_at":35,"id":36,"uuid":37,"content":38,"slug":57,"full_slug":58,"sort_by_date":59,"position":60,"tag_list":61,"is_startpage":24,"parent_id":62,"meta_data":59,"group_id":63,"first_published_at":64,"release_id":59,"lang":65,"path":59,"alternates":66,"default_full_slug":59,"translated_slugs":59,"_stopResolving":67},"Christopher Ruppel","2026-03-17T16:24:01.161Z","2026-04-06T00:09:57.160Z","2026-04-06T00:09:57.172Z",155955368617120,"5ce15b6e-5eb2-4ef8-ac4a-d147b128da73",{"_uid":39,"name":32,"blocks":40,"component":50,"expertise":51,"profile_picture":52},"01c2c833-f9f0-45f9-8b9b-80f2b5fa8be9",[41],{"_uid":42,"title":43,"blocks":44,"component":49,"is_large_title":24},"c0441a69-4a21-4765-986a-e2b9023e724d","Expertise ",[45],{"_uid":46,"copy":47,"component":48},"8f5c2874-33b2-4679-b5de-c44bb00257dd","Christopher Ruppel a rejoint Keel Infrastructure en tant que vice-président principal, Énergie. Chris apporte plus de deux décennies d'expérience à la croisée des infrastructures informatiques de pointe et de l'optimisation des systèmes énergétiques. Il a dirigé des stratégies de développement couvrant la production sur site, les actifs raccordés au réseau et les solutions de conversion du gaz en électricité pour soutenir les environnements d'IA et de calcul en périphérie à haute densité.\n\nL'expérience de Chris comprend la conception et le développement de plus de 4 GW de projets énergétiques à l'échelle mondiale, la structuration de financements de projets s'élevant à plusieurs milliards de dollars, ainsi que le conseil aux opérateurs de centres de données sur des stratégies énergétiques résilientes et optimisées sur le plan commercial. Avant de rejoindre Keel, il a occupé le poste de responsable du développement énergétique chez MARA Holdings, où il a dirigé la stratégie de la division Digital Energy de l'entreprise, en se concentrant sur les solutions d'alimentation derrière le compteur, l'optimisation thermique et les initiatives de réponse à la demande.","team_member_copy_block","team_member_block","team_member","Vice-président principal, Énergie",{"id":53,"alt":54,"name":19,"focus":19,"title":19,"source":19,"filename":55,"copyright":19,"fieldtype":21,"meta_data":56,"is_external_url":24},158128143448457,"Portrait of Christ Ruppel","https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002F853x1280\u002Ffb552a6926\u002Fchris-ruppel-large.jpeg",{"alt":54,"title":19,"source":19,"copyright":19},"christopher-ruppel","fr\u002Fteam-members\u002Fchristopher-ruppel",null,-170,[],146010902535401,"ccfaacf8-69a7-4d3e-8c7b-b317d370de47","2026-03-17T16:24:26.848Z","fr",[],true,[69],{"_uid":70,"copy":71,"component":103},"3e0da7d4-97e5-4754-8cb7-7c7e276efe50",{"type":72,"attrs":73,"content":74},"doc",{"backgroundColor":59},[75,87,92],{"type":76,"attrs":77,"content":78},"paragraph",{"textAlign":59},[79],{"text":80,"type":81,"marks":82},"Texas' moratorium on new data-center approvals is the defining story of the week, and a clear signal that the AI infrastructure boom is entering a more heavily scrutinized phase. In this issue of Digital Power Weekly, Keel Infrastructure SVP Chris Ruppel unpacks what it means that ERCOT's interconnection queue has swelled to more than 474 GW, over five times the state's record peak demand, with data centers accounting for roughly 90% of new power requests. Texas' audit will examine projects' electricity and water requirements, on-site generation, public incentives, ownership and community impacts, while ERCOT has paused its initial \"Batch Zero\" review pending the outcome.","text",[83],{"type":84,"attrs":85},"textStyle",{"color":86},"#000000",{"type":76,"attrs":88,"content":89},{"textAlign":59},[90],{"type":91},"hard_break",{"type":76,"attrs":93,"content":94},{"textAlign":59},[95],{"text":96,"type":81,"marks":97},"Read More",[98],{"type":99,"attrs":100},"link",{"href":101,"uuid":59,"anchor":59,"target":102,"linktype":21},"https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002Fx\u002Fe90bf332d5\u002Fdpd-issue-1-1.pdf","_blank","post_copy","Digital Power Digest","post",{"id":17,"alt":18,"name":19,"focus":19,"title":19,"source":19,"filename":20,"copyright":19,"fieldtype":21,"meta_data":107,"is_external_url":24},{"alt":18,"size":23,"title":19,"source":19,"copyright":19},{"id":17,"alt":18,"name":19,"focus":19,"title":19,"source":19,"filename":20,"copyright":19,"fieldtype":21,"meta_data":109,"is_external_url":24},{"alt":18,"size":23,"title":19,"source":19,"copyright":19},"texas-data-center-moratorium-ai-infrastructure","fr\u002Fposts\u002Ftexas-data-center-moratorium-ai-infrastructure",-230,[],146629530122758,"c5621d38-765f-4649-bfd8-e593d05d5c06","2026-08-11T15:57:53.867Z",[],1787257191,[120],{"name":32,"created_at":33,"published_at":34,"updated_at":35,"id":36,"uuid":37,"content":121,"slug":57,"full_slug":58,"sort_by_date":59,"position":60,"tag_list":128,"is_startpage":24,"parent_id":62,"meta_data":59,"group_id":63,"first_published_at":64,"release_id":59,"lang":65,"path":59,"alternates":129,"default_full_slug":59,"translated_slugs":59},{"_uid":39,"name":32,"blocks":122,"component":50,"expertise":51,"profile_picture":126},[123],{"_uid":42,"title":43,"blocks":124,"component":49,"is_large_title":24},[125],{"_uid":46,"copy":47,"component":48},{"id":53,"alt":54,"name":19,"focus":19,"title":19,"source":19,"filename":55,"copyright":19,"fieldtype":21,"meta_data":127,"is_external_url":24},{"alt":54,"title":19,"source":19,"copyright":19},[],[],[],{"age":132,"cache-control":133,"connection":134,"content-encoding":135,"content-type":136,"date":137,"etag":138,"referrer-policy":139,"sb-be-version":140,"server":141,"transfer-encoding":142,"vary":143,"via":144,"x-amz-cf-id":145,"x-amz-cf-pop":146,"x-cache":147,"x-content-type-options":148,"x-frame-options":149,"x-permitted-cross-domain-policies":150,"x-request-id":151,"x-runtime":152,"x-xss-protection":153},"69504","max-age=0, public, s-maxage=604800, stale-if-error=3600","keep-alive","gzip","application\u002Fjson; charset=utf-8","Thu, 20 Aug 2026 20:20:11 GMT","W\u002F\"d89ef95fee6985ca0654698452bc5edb\"","strict-origin-when-cross-origin","5.946.1","nginx\u002F1.29.1","chunked","Origin,Accept-Encoding","1.1 65ed266dda094f56ecb91fc422768658.cloudfront.net (CloudFront)","BPTJqiG454Wx8s9KHYZJbCK5M4lDVIkOTHUbqyW_zkV6z1fUAWycAw==","IAD55-P6","Hit from cloudfront","nosniff","SAMEORIGIN","none","668bd02e-76f5-450c-9b33-8aa3ed53a1b0","0.025292","0",1787326715328]