[{"data":1,"prerenderedAt":362},["ShallowReactive",2],{"{\"language\":\"en\",\"resolve_relations\":[\"post.author\"]}posts\u002Fbitcoin-mining-e-waste-recycling-220-tons-landfill":3},{"data":4,"headers":339},{"story":5,"cv":330,"rels":331,"links":338},{"name":6,"created_at":7,"published_at":8,"updated_at":9,"id":10,"uuid":11,"content":12,"slug":323,"full_slug":324,"sort_by_date":43,"position":325,"tag_list":326,"is_startpage":39,"parent_id":327,"meta_data":43,"group_id":328,"first_published_at":8,"release_id":43,"lang":49,"path":43,"alternates":329,"default_full_slug":43,"translated_slugs":43},"Bitcoin mining e-waste recycling 220 tons landfill ","2026-11-20T19:33:14.557Z","2026-11-23T14:03:36.422Z","2026-11-23T14:03:36.437Z",243767683326725,"86f0dcc6-3250-47ae-8c2e-c26647555a0b",{"seo":13,"_uid":19,"date":20,"intro":21,"title":22,"author":23,"blocks":52,"category":313,"featured":39,"component":314,"thumbnail":315,"hero_image":317},[14],{"_uid":15,"title":16,"component":17,"description":18},"e67229cf-a0d1-4a97-8458-8d600eedc632","Keel Infrastructure recycles 220 tons e-waste","seo","Keel Infrastructure recycles 220 tons of legacy bitcoin mining in Pennsylvania, demonstrating its commitment to responsible e-waste management.","e7fdff7e-72c1-4a72-89cf-c9b4d57903d0","2026-11-23 00:00","Keel Infrastructure recycled 220 tons of legacy bitcoin mining equipment from its Panther Creek and Scrubgrass sites in Pennsylvania, keeping the electronic waste out of landfills. Through its partnership with certified recycler ERS International, Keel is advancing responsible e-waste management and sustainable practices across its operations as it develops AI and high-performance computing (HPC) infrastructure.\n\n","Keel Infrastructure Recycles 220 Tons E-waste",{"name":24,"created_at":25,"published_at":26,"updated_at":27,"id":28,"uuid":29,"content":30,"slug":41,"full_slug":42,"sort_by_date":43,"position":44,"tag_list":45,"is_startpage":39,"parent_id":46,"meta_data":43,"group_id":47,"first_published_at":48,"release_id":43,"lang":49,"path":43,"alternates":50,"default_full_slug":43,"translated_slugs":43,"_stopResolving":51},"Keel Infrastructure","2026-02-19T07:52:34.471Z","2026-03-20T00:17:18.222Z","2026-03-20T00:17:18.234Z",146628421572761,"66c5b441-4607-4285-92a7-177f27efac92",{"_uid":31,"name":24,"avatar":32,"component":40},"82f20dcf-1924-44b9-836a-e8a96a7fba1b",{"id":33,"alt":34,"name":35,"focus":35,"title":35,"source":35,"filename":36,"copyright":35,"fieldtype":37,"meta_data":38,"is_external_url":39},156779093035487,"picture of keel monogram","","https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002F256x256\u002F44db44a7c3\u002Fkeel-icon.png","asset",{"alt":34,"title":35,"source":35,"copyright":35},false,"author","keel-infra","authors\u002Fkeel-infra",null,0,[],146628369901719,"5f0ed6ed-cb97-4b89-8159-87326d1f701b","2026-02-19T07:52:47.947Z","default",[],true,[53],{"_uid":54,"copy":55,"component":312},"5ae4e5af-89e9-48bd-93fd-fd9efa4d71f7",{"type":56,"attrs":57,"content":58},"doc",{"backgroundColor":43},[59,78,86,95,103,116,124,151,159,167,189,202,210,218,226,239,275,297,305],{"type":60,"attrs":61,"content":62},"paragraph",{"textAlign":43},[63,73],{"text":64,"type":65,"marks":66},"We Recycled 220 Tons of Legacy Mining Equipment and Kept It Out of the Landfill","text",[67,71],{"type":68,"attrs":69},"textStyle",{"color":70},"#000000",{"type":72},"bold",{"text":74,"type":65,"marks":75}," ",[76],{"type":68,"attrs":77},{"color":70},{"type":60,"attrs":79,"content":80},{"textAlign":43},[81],{"text":82,"type":65,"marks":83},"When we acquired Stronghold Digital Mining in March 2025, we were buying power capacity, land, and a development pipeline at two Pennsylvania sites — Panther Creek and Scrubgrass. The deal gave us the megawatts of secured capacity and a foundation for the AI and HPC sites we're looking to build. It also gave our company, now known as Keel Infrastructure, hardware we didn't need. ",[84],{"type":68,"attrs":85},{"color":35},{"type":60,"attrs":87,"content":89},{"textAlign":88},"left",[90],{"text":91,"type":65,"marks":92},"Stronghold had a large volume of legacy bitcoin mining equipment in storage, and it was still sitting idle when we took ownership. Our operations teams knew the hardware was there and once we completed a full inventory earlier this year, we could see exactly how much e-waste we were dealing with. ",[93],{"type":68,"attrs":94},{"color":35},{"type":60,"attrs":96,"content":97},{"textAlign":88},[98],{"text":99,"type":65,"marks":100},"Unlike a general-purpose server, a bitcoin mining ASIC — an application-specific integrated circuit — can't be redeployed to a less demanding workload. Storing it took up space we needed, and the Stronghold inventory was considerably larger than anything we had previously sent for recycling. ",[101],{"type":68,"attrs":102},{"color":35},{"type":60,"attrs":104,"content":105},{"textAlign":88},[106,112],{"text":107,"type":65,"marks":108},"Why we chose certified processing",[109,111],{"type":68,"attrs":110},{"color":35},{"type":72},{"text":74,"type":65,"marks":113},[114],{"type":68,"attrs":115},{"color":35},{"type":60,"attrs":117,"content":118},{"textAlign":88},[119],{"text":120,"type":65,"marks":121},"Once we determined exactly what we had, we began thinking about what to do with it. We could sell the equipment to a local scrap dealer for commodity value, or we could turn to our certified recycling partner to process it with a documented chain of custody. Given the volume, and the need to handle some components with care, we chose the second route. ",[122],{"type":68,"attrs":123},{"color":35},{"type":60,"attrs":125,"content":126},{"textAlign":88},[127,132,146],{"text":128,"type":65,"marks":129},"Since 2024, we've been sending our retired equipment to ",[130],{"type":68,"attrs":131},{"color":35},{"text":133,"type":65,"marks":134},"ERS International",[135,141,144],{"type":136,"attrs":137},"link",{"href":138,"uuid":43,"anchor":43,"target":139,"linktype":140},"https:\u002F\u002Fwww.ers-international.com\u002F","_blank","url",{"type":68,"attrs":142},{"color":143},"#467886",{"type":145},"underline",{"text":147,"type":65,"marks":148}," (ERS), a certified electronics recycler and IT asset disposition provider. Its facility in Toronto holds R2v3 responsible recycling certification, plus ISO 9001 for quality management, ISO 14001 for environmental management, ISO 45001 for occupational health and safety, and ISO 27001 for information security.   ",[149],{"type":68,"attrs":150},{"color":35},{"type":60,"attrs":152,"content":153},{"textAlign":88},[154],{"text":155,"type":65,"marks":156},"ERS tracks each shipment from collection through final processing and produces a documented chain of custody for every unit. All data-bearing devices are wiped or physically destroyed before material recovery begins, and intact equipment isn't resold or exported. ",[157],{"type":68,"attrs":158},{"color":35},{"type":60,"attrs":160,"content":161},{"textAlign":88},[162],{"text":163,"type":65,"marks":164},"\"At this scale, responsible recycling means being able to account for what happens to the equipment long after it leaves the site,\" said Joseph Cimorelli, Chief Operating Officer of ERS International. \"Keel took that responsibility seriously. Together, we put a process in place to recover valuable materials, keep 220 tons of e-waste out of landfill, and document the work from collection through final processing.\" ",[165],{"type":68,"attrs":166},{"color":35},{"type":60,"attrs":168,"content":169},{"textAlign":88},[170,175,184],{"text":171,"type":65,"marks":172},"Our approach differs when devices can still serve a purpose. We've donated 30 laptops, six monitors, and nine keyboards to the ",[173],{"type":68,"attrs":174},{"color":35},{"text":176,"type":65,"marks":177},"Electronic Recycling Association",[178,181,183],{"type":136,"attrs":179},{"href":180,"uuid":43,"anchor":43,"target":139,"linktype":140},"https:\u002F\u002Felectronicrecyclingassociation.com\u002F",{"type":68,"attrs":182},{"color":143},{"type":145},{"text":185,"type":65,"marks":186},", a nonprofit that refurbishes equipment and donates it to charities, schools, and community organizations. ",[187],{"type":68,"attrs":188},{"color":35},{"type":60,"attrs":190,"content":191},{"textAlign":88},[192,198],{"text":193,"type":65,"marks":194},"What our equipment cleanup involved",[195,197],{"type":68,"attrs":196},{"color":35},{"type":72},{"text":74,"type":65,"marks":199},[200],{"type":68,"attrs":201},{"color":35},{"type":60,"attrs":203,"content":204},{"textAlign":88},[205],{"text":206,"type":65,"marks":207},"The logistics for the Stronghold equipment were ​​​​more complicated than usual. It was pulled from storage, palletized, and loaded into trailers for pickup. The most challenging part was doing that repeatedly, and quickly, because our Panther Creek and Scrubgrass sites were being readied for development. ",[208],{"type":68,"attrs":209},{"color":35},{"type":60,"attrs":211,"content":212},{"textAlign":88},[213],{"text":214,"type":65,"marks":215},"It took 25 pickups to clear 220 tons of e-waste from the Stronghold stockpile — mostly retired bitcoin mining and compute assets, as well as power supply units, network devices, cooling fans, and cabling. That's the weight of 42 full-grown African elephants or almost six Boeing 737s.  ",[216],{"type":68,"attrs":217},{"color":35},{"type":60,"attrs":219,"content":220},{"textAlign":88},[221],{"text":222,"type":65,"marks":223},"Across our U.S. and Canadian operations, we’ve diverted 100% of e-waste from the landfill since 2024. ",[224],{"type":68,"attrs":225},{"color":35},{"type":60,"attrs":227,"content":228},{"textAlign":88},[229,235],{"text":230,"type":65,"marks":231},"What this means for the campuses we're building",[232,234],{"type":68,"attrs":233},{"color":35},{"type":72},{"text":74,"type":65,"marks":236},[237],{"type":68,"attrs":238},{"color":35},{"type":60,"attrs":240,"content":241},{"textAlign":88},[242,247,256,261,270],{"text":243,"type":65,"marks":244},"AI and HPC hardware are retired in large batches. GPU-dense servers have an economic life of ",[245],{"type":68,"attrs":246},{"color":35},{"text":248,"type":65,"marks":249},"three to five years",[250,253,255],{"type":136,"attrs":251},{"href":252,"uuid":43,"anchor":43,"target":139,"linktype":140},"https:\u002F\u002Fwww.cliffordchance.com\u002Fcontent\u002Fdam\u002Fcliffordchance\u002Fbriefings\u002F2026\u002F03\u002Fdata-centres-and-ai-compute-infrastructure-insights-2026.pdf#page=3",{"type":68,"attrs":254},{"color":143},{"type":145},{"text":257,"type":65,"marks":258}," and new chip architectures arrive on ",[259],{"type":68,"attrs":260},{"color":35},{"text":262,"type":65,"marks":263},"18- to 24-month cycles",[264,267,269],{"type":136,"attrs":265},{"href":266,"uuid":43,"anchor":43,"target":139,"linktype":140},"https:\u002F\u002Fwww.tomshardware.com\u002Fpc-components\u002Fgpus\u002Fnvidia-updates-data-center-roadmap-with-rosa-cpu-and-stacked-feynman-gpus-optical-nvlink-groq-lpus-with-nvfp4-and-nvlink-also-on-deck",{"type":68,"attrs":268},{"color":143},{"type":145},{"text":271,"type":65,"marks":272},". ",[273],{"type":68,"attrs":274},{"color":35},{"type":60,"attrs":276,"content":277},{"textAlign":88},[278,283,292],{"text":279,"type":65,"marks":280},"The Global Electronics Council's ",[281],{"type":68,"attrs":282},{"color":35},{"text":284,"type":65,"marks":285},"Purchaser Guide for Circularity",[286,289,291],{"type":136,"attrs":287},{"href":288,"uuid":43,"anchor":43,"target":139,"linktype":140},"https:\u002F\u002Fglobalelectronicscouncil.org\u002Fwp-content\u002Fuploads\u002Fgec-purchaser-guide-circularity.pdf",{"type":68,"attrs":290},{"color":143},{"type":145},{"text":293,"type":65,"marks":294}," asks vendors to break out final destinations for recovered products by category and to document whether they maintain a zero-waste-to-landfill policy. Guidance like this reflects growing customer interest in how infrastructure providers handle end-of-life equipment. Our tenants will own and operate their hardware, but we intend to make the same certified process available to them when they need it. ",[295],{"type":68,"attrs":296},{"color":35},{"type":60,"attrs":298,"content":299},{"textAlign":88},[300],{"text":301,"type":65,"marks":302},"The 220 tons we cleared this year came from a previous business, and we don’t expect to generate e-waste on this scale from our own operations going forward. But we plan to own these sites for the long term, so end-of-life planning is part of how we run them. ",[303],{"type":68,"attrs":304},{"color":35},{"type":60,"attrs":306,"content":307},{"textAlign":88},[308],{"text":74,"type":65,"marks":309},[310],{"type":68,"attrs":311},{"color":35},"post_copy","Thought Leadership","post",{"id":33,"alt":34,"name":35,"focus":35,"title":35,"source":35,"filename":36,"copyright":35,"fieldtype":37,"meta_data":316,"is_external_url":39},{"alt":34,"title":35,"source":35,"copyright":35},{"id":318,"alt":319,"name":35,"focus":35,"title":35,"source":35,"filename":320,"copyright":35,"fieldtype":37,"meta_data":321,"is_external_url":39},205815248331848,"Panther Creek_View 2_8-4-26","https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002F7680x4272\u002Fe9684240a2\u002Fpanther-creek_view-2_8-4-26.jpg",{"alt":319,"size":322,"title":35,"source":35,"copyright":35},"7680x4272","bitcoin-mining-e-waste-recycling-220-tons-landfill","posts\u002Fbitcoin-mining-e-waste-recycling-220-tons-landfill",-420,[],146629530122758,"adca7274-f80e-4f3c-abf6-c886710911d0",[],1795442616,[332],{"name":24,"created_at":25,"published_at":26,"updated_at":27,"id":28,"uuid":29,"content":333,"slug":41,"full_slug":42,"sort_by_date":43,"position":44,"tag_list":336,"is_startpage":39,"parent_id":46,"meta_data":43,"group_id":47,"first_published_at":48,"release_id":43,"lang":49,"path":43,"alternates":337,"default_full_slug":43,"translated_slugs":43},{"_uid":31,"name":24,"avatar":334,"component":40},{"id":33,"alt":34,"name":35,"focus":35,"title":35,"source":35,"filename":36,"copyright":35,"fieldtype":37,"meta_data":335,"is_external_url":39},{"alt":34,"title":35,"source":35,"copyright":35},[],[],[],{"cache-control":340,"connection":341,"content-encoding":342,"content-type":343,"date":344,"etag":345,"referrer-policy":346,"sb-be-version":347,"server":348,"strict-transport-security":349,"transfer-encoding":350,"vary":351,"via":352,"x-amz-cf-id":353,"x-amz-cf-pop":354,"x-cache":355,"x-content-type-options":356,"x-frame-options":357,"x-permitted-cross-domain-policies":358,"x-request-id":359,"x-runtime":360,"x-xss-protection":361},"max-age=0, public, s-maxage=604800, stale-if-error=3600","keep-alive","gzip","application\u002Fjson; charset=utf-8","Mon, 23 Nov 2026 14:04:38 GMT","W\u002F\"84d1159f10528ef71db6e60d36e99f44\"","strict-origin-when-cross-origin","5.1017.0","nginx","max-age=31536000","chunked","Origin,Accept-Encoding","1.1 46a0017ecef439253017ac2cc1624646.cloudfront.net (CloudFront)","-c5mBJ-LMY6qr69EdR5G90esz5r38ZrXqEjOGnF7f235wUabJF_a-Q==","IAD55-P6","Miss from cloudfront","nosniff","SAMEORIGIN","none","a734a3ef-26e6-4846-ac77-de9b49be4108","0.038965","0",1795442678484]