[{"data":1,"prerenderedAt":154},["ShallowReactive",2],{"{\"language\":\"en\",\"resolve_relations\":[\"post.author\"]}posts\u002Ftexas-data-center-moratorium-ai-infrastructure":3},{"data":4,"headers":131},{"story":5,"cv":118,"rels":119,"links":130},{"name":6,"created_at":7,"published_at":8,"updated_at":9,"id":10,"uuid":11,"content":12,"slug":110,"full_slug":111,"sort_by_date":59,"position":112,"tag_list":113,"is_startpage":24,"parent_id":114,"meta_data":59,"group_id":115,"first_published_at":116,"release_id":59,"lang":65,"path":59,"alternates":117,"default_full_slug":59,"translated_slugs":59},"Texas Moratorium Puts Guardrails on AI Data Centers","2026-08-11T15:44:35.601Z","2026-08-11T16:42:41.681Z","2026-08-11T16:42:41.694Z",207968156083520,"3e2ad306-7ef8-4927-ad16-909c8e8f03cf",{"seo":13,"_uid":27,"date":28,"intro":29,"title":30,"author":31,"blocks":68,"category":104,"featured":24,"component":105,"thumbnail":106,"hero_image":108},[14],{"_uid":15,"image":16,"title":6,"component":25,"description":26},"0b2255c1-04c6-484f-9505-d1f055394cba",{"id":17,"alt":18,"name":19,"focus":19,"title":19,"source":19,"filename":20,"copyright":19,"fieldtype":21,"meta_data":22,"is_external_url":24},207968453842624,"dpd_1","","https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002F1261x831\u002F718e276b65\u002Fistock-1299944072.jpg","asset",{"alt":18,"size":23,"title":19,"source":19,"copyright":19},"1261x831",false,"seo","Texas' moratorium on new data-center approvals is the defining story of the week, and a clear signal that the AI infrastructure boom is entering a more heavily scrutinized phase. In this issue of Digital Power Weekly, Keel Infrastructure SVP Chris Ruppel unpacks what it means that ERCOT's interconnection queue has swelled to more than 474 GW, over five times the state's record peak demand, with data centers accounting for roughly 90% of new power requests. Texas' audit will examine projects' electricity and water requirements, on-site generation, public incentives, ownership and community impacts, while ERCOT has paused its initial \"Batch Zero\" review pending the outcome.\n\nAt the same time, the underlying demand for AI infrastructure remains substantial. Anthropic signed a $10 billion computing agreement, financiers are weighing at least $36 billion of additional debt to fund its chip capacity, CoreWeave is expanding into Indonesia, and Caterpillar reported robust data center-driven demand for power equipment. Ruppel's analysis reads these signals alongside the Texas moratorium, arguing that capital commitments have not slowed even as the regulatory environment tightens around them.\n\nRuppel's bottom line: this week's throughline is not a slowdown in AI ambition, but a shift from unchecked expansion toward proof of viability. Ruppel's bottom line is that AI ambition has not slowed this week. Expansion now has to come with proof of viability. Developers increasingly must demonstrate that projects can be financed responsibly, supported by constrained grids and water systems, operated reliably, and secured against emerging technical and cyber risks. That shift in what counts as investment-ready is quickly becoming the new baseline for site selection.\n\n","e270c710-bcda-4642-9482-84d4501225d8","2026-08-10 00:00","Texas' data center moratorium tests AI infrastructure growth as ERCOT's queue hits 474 GW. Keel's Chris Ruppel breaks down what it means for developers.","Digital Power Digest- Volume 1: August 3 - August 9, 2026",{"name":32,"created_at":33,"published_at":34,"updated_at":35,"id":36,"uuid":37,"content":38,"slug":57,"full_slug":58,"sort_by_date":59,"position":60,"tag_list":61,"is_startpage":24,"parent_id":62,"meta_data":59,"group_id":63,"first_published_at":64,"release_id":59,"lang":65,"path":59,"alternates":66,"default_full_slug":59,"translated_slugs":59,"_stopResolving":67},"Christopher Ruppel","2026-03-17T16:24:01.161Z","2026-04-06T00:09:57.160Z","2026-04-06T00:09:57.172Z",155955368617120,"5ce15b6e-5eb2-4ef8-ac4a-d147b128da73",{"_uid":39,"name":32,"blocks":40,"component":50,"expertise":51,"profile_picture":52},"01c2c833-f9f0-45f9-8b9b-80f2b5fa8be9",[41],{"_uid":42,"title":43,"blocks":44,"component":49,"is_large_title":24},"c0441a69-4a21-4765-986a-e2b9023e724d","Expertise ",[45],{"_uid":46,"copy":47,"component":48},"8f5c2874-33b2-4679-b5de-c44bb00257dd","Christopher Ruppel joined Keel Infrastructure as Senior Vice President of Power. Chris brings more than two decades of experience at the intersection of advanced compute infrastructure and energy systems optimization. He has led development strategies spanning onsite generation, grid-connected assets, and gas-to-power solutions supporting high-density AI and edge-compute environments.\nChris’s experience includes originating and developing more than 4 GW of energy projects globally, structuring billions of dollars in project financings, and advising data center operators on resilient, commercially optimized energy strategies. Prior to joining Keel, he served as Head of Energy Development at MARA Holdings, where he led strategy for the company’s Digital Energy division, focusing on behind-the-meter power solutions, thermal optimization, and demand-response initiatives.","team_member_copy_block","team_member_block","team_member","Senior Vice President, Power",{"id":53,"alt":54,"name":19,"focus":19,"title":19,"source":19,"filename":55,"copyright":19,"fieldtype":21,"meta_data":56,"is_external_url":24},158128143448457,"Portrait of Christ Ruppel","https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002F853x1280\u002Ffb552a6926\u002Fchris-ruppel-large.jpeg",{"alt":54,"title":19,"source":19,"copyright":19},"christopher-ruppel","team-members\u002Fchristopher-ruppel",null,-170,[],146010902535401,"ccfaacf8-69a7-4d3e-8c7b-b317d370de47","2026-03-17T16:24:26.848Z","default",[],true,[69],{"_uid":70,"copy":71,"component":103},"3e0da7d4-97e5-4754-8cb7-7c7e276efe50",{"type":72,"attrs":73,"content":74},"doc",{"backgroundColor":59},[75,87,92],{"type":76,"attrs":77,"content":78},"paragraph",{"textAlign":59},[79],{"text":80,"type":81,"marks":82},"Texas' moratorium on new data-center approvals is the defining story of the week, and a clear signal that the AI infrastructure boom is entering a more heavily scrutinized phase. In this issue of Digital Power Weekly, Keel Infrastructure SVP Chris Ruppel unpacks what it means that ERCOT's interconnection queue has swelled to more than 474 GW, over five times the state's record peak demand, with data centers accounting for roughly 90% of new power requests. Texas' audit will examine projects' electricity and water requirements, on-site generation, public incentives, ownership and community impacts, while ERCOT has paused its initial \"Batch Zero\" review pending the outcome.","text",[83],{"type":84,"attrs":85},"textStyle",{"color":86},"#000000",{"type":76,"attrs":88,"content":89},{"textAlign":59},[90],{"type":91},"hard_break",{"type":76,"attrs":93,"content":94},{"textAlign":59},[95],{"text":96,"type":81,"marks":97},"Read More",[98],{"type":99,"attrs":100},"link",{"href":101,"uuid":59,"anchor":59,"target":102,"linktype":21},"https:\u002F\u002Fa.storyblok.com\u002Ff\u002F290340181793214\u002Fx\u002Fe90bf332d5\u002Fdpd-issue-1-1.pdf","_blank","post_copy","Digital Power Digest","post",{"id":17,"alt":18,"name":19,"focus":19,"title":19,"source":19,"filename":20,"copyright":19,"fieldtype":21,"meta_data":107,"is_external_url":24},{"alt":18,"size":23,"title":19,"source":19,"copyright":19},{"id":17,"alt":18,"name":19,"focus":19,"title":19,"source":19,"filename":20,"copyright":19,"fieldtype":21,"meta_data":109,"is_external_url":24},{"alt":18,"size":23,"title":19,"source":19,"copyright":19},"texas-data-center-moratorium-ai-infrastructure","posts\u002Ftexas-data-center-moratorium-ai-infrastructure",-230,[],146629530122758,"c5621d38-765f-4649-bfd8-e593d05d5c06","2026-08-11T15:57:53.867Z",[],1787257191,[120],{"name":32,"created_at":33,"published_at":34,"updated_at":35,"id":36,"uuid":37,"content":121,"slug":57,"full_slug":58,"sort_by_date":59,"position":60,"tag_list":128,"is_startpage":24,"parent_id":62,"meta_data":59,"group_id":63,"first_published_at":64,"release_id":59,"lang":65,"path":59,"alternates":129,"default_full_slug":59,"translated_slugs":59},{"_uid":39,"name":32,"blocks":122,"component":50,"expertise":51,"profile_picture":126},[123],{"_uid":42,"title":43,"blocks":124,"component":49,"is_large_title":24},[125],{"_uid":46,"copy":47,"component":48},{"id":53,"alt":54,"name":19,"focus":19,"title":19,"source":19,"filename":55,"copyright":19,"fieldtype":21,"meta_data":127,"is_external_url":24},{"alt":54,"title":19,"source":19,"copyright":19},[],[],[],{"age":132,"cache-control":133,"connection":134,"content-encoding":135,"content-type":136,"date":137,"etag":138,"referrer-policy":139,"sb-be-version":140,"server":141,"transfer-encoding":142,"vary":143,"via":144,"x-amz-cf-id":145,"x-amz-cf-pop":146,"x-cache":147,"x-content-type-options":148,"x-frame-options":149,"x-permitted-cross-domain-policies":150,"x-request-id":151,"x-runtime":152,"x-xss-protection":153},"69505","max-age=0, public, s-maxage=604800, stale-if-error=3600","keep-alive","gzip","application\u002Fjson; charset=utf-8","Thu, 20 Aug 2026 20:20:11 GMT","W\u002F\"1bfc0b4867566e0be4ab4ce88dd7b043\"","strict-origin-when-cross-origin","5.946.1","nginx\u002F1.29.1","chunked","Origin,Accept-Encoding","1.1 4fc8673a211db56277b05b91a8f98872.cloudfront.net (CloudFront)","l6GqaPEfSPSY9ccm3lHWBin9ThfnRpQVjGuRJYM0MhBuAs3Fh4Is9A==","IAD55-P6","Hit from cloudfront","nosniff","SAMEORIGIN","none","2ad05bd2-02bf-4ea0-9f35-b2500e3000d0","0.029767","0",1787326716147]